• Barry st display floorplate 1
    Mobile barry st display floorplate 1
Barry Street Display Suite
 
Designed by Fieldwork for Milieu Property, the Barry Street display suite was created as a sales tool for Milieu’s 21 Thoughtful Townhouses launched in December 2016. The construction timeframe was 6 weeks and involved a feature engineered timber frame, display podium, replica kitchen and outdoor deck area.  
Status:
Built
Construction Time:
6 weeks 
Architect:
Fieldwork
Client:
Milieu Property
Barry st display image 1
Barry st display image 2
Barry st display image 3
Barry st display image 4
Barry st display image 5